PJM 5400 Module 6 Written Assignment: Administering the Smart Meter Contract Through Closeout Example

Reviewed by Edgar Pennington, MBA Thomas Edison State University Updated October 2026

This PJM 5400 Module 6 sample answers a written assignment on the post-award phase, the last module of Procurement and Vendor Management in TESU's Master of Science in Management in Project Management. PJM-5400 closes with what happens after award: administering the contract, monitoring performance, managing changes, paying for accepted work, resolving disputes and closing out. The paper plans how the composite Monmouth County utility will administer its signed meter contract. It sets a kickoff agenda and five performance measures, shows how the change process handles a request for 1,200 additional difficult-access meters, ties payment to acceptance, defines a dispute ladder and lists the steps of closeout.

CoursePJM-5400 Procurement and Vendor Management
ModuleModule 6
Paper typeModule 6 written assignment: the post-award phase
LengthAbout 562 words, 5 pages
FormatAPA 7 student paper
SchoolThomas Edison State University
ProgramM.S. in Management in Project Management
UpdatedOctober 2026

Free sample paper for PJM 5400 Module 6

1

After the Signature: Administering a Smart Meter Contract From Kickoff to Closeout

Student Name

M.S. in Management in Project Management, Thomas Edison State University

PJM-5400: Procurement and Vendor Management

Mentor Name

Month Day, Year

What this page is doingThe title emphasizes that the contract's value is realized in administration, the phase the paper plans.
2

After the Signature: Administering a Smart Meter Contract From Kickoff to Closeout

Why Administration Matters

Garrett (2010) argues that many contracts fail not at award but in administration, when buyer and seller lose track of obligations, changes and performance. A three-year, $14 million contract touching 48,000 homes needs structured administration from the first day.

The Kickoff

A kickoff meeting within two weeks of award will review the scope, performance measures, reporting, change process, invoicing and contacts. Both parties will name a contract administrator and a technical lead, and agree on a monthly performance review.

Performance Measures

Ellram (1995) argued that buyers should measure supplier performance in terms of total cost, including quality failures and service problems, not only price; these measures capture the costs customers and the utility would bear if performance slipped.

MeasureStandardConsequence
Network read rate99 percent of meters read dailyA $40 yearly credit for each meter that cannot be read, below standard
Installation rate2,000 meters a monthIncentive per meter above rate; recovery plan if below for two months
Installation qualityUnder 1 percent leaks or rework within 30 daysVendor repairs at its cost; retraining
Customer complaintsUnder 2 per 1,000 installationsReview of installer conduct
Data deliveryHourly data to billing system by 6 a.m. dailyService credits

Managing Changes: The Difficult-Access Request

In month seven, the installer reported that 1,200 meters sit behind finished basement walls, more than the 400 assumed in the pricing schedule. The contract's change clause requires a written change request, review by the utility's technical lead, a price based on the contract's difficult-access unit price and approval by the contracting officer.

StepAction
RequestInstaller submits a list of addresses with photographs
VerificationUtility inspects a sample of 60 and confirms 1,140 qualify
PricingContract difficult-access price, $145 per meter
ApprovalContracting officer issues a modification for 1,140 meters, $165,300
What this page is doingVerifying the claim with a sample before approving the change shows how a buyer protects public funds while paying fairly for real extra work.
3

Payments and Acceptance

The utility will pay monthly for meters installed, tested and accepted. Acceptance requires a successful read for seven consecutive days. Ten percent of each payment is retained until final acceptance of each installation zone, protecting the utility if problems appear.

Disputes

The contract's dispute ladder starts with the contract administrators, moves to project executives after ten days and then to mediation before any litigation. Most disputes should end at the first step if both sides keep records. Bajari and Tadelis (2001) note that changes are where fixed-price contracts become costly to administer, which is why a clear, agreed process for pricing them matters as much as the original price.

Communication During Performance

Monthly performance reviews will use the measures above, with a one-page report shared with the board each quarter. Customer complaints will be logged by customer service and reviewed weekly with the installer's supervisor, so that problems with a particular crew are caught early.

Closeout

Closeout stepPurpose
Final acceptance by zoneConfirms all meters read correctly
Release of retainagePays withheld amounts after acceptance
Warranty startBegins the 20-year meter warranty and 10-year battery warranty
Records and data handoverTransfers installation records and network documentation
Vendor performance evaluationRecords performance for future procurements
Lessons learnedCaptures what to change in the next procurement

Conclusion

Clear measures, a disciplined change process, payment tied to acceptance and a planned closeout turn a signed contract into delivered results and protect the utility and its customers throughout.

References

Bajari, P., & Tadelis, S. (2001). Incentives versus transaction costs: A theory of procurement contracts. RAND Journal of Economics, 32(3), 387-407. https://doi.org/10.2307/2696361

Ellram, L. M. (1995). Total cost of ownership: An analysis approach for purchasing. International Journal of Physical Distribution & Logistics Management, 25(8), 4-23. https://doi.org/10.1108/09600039510099928

Garrett, G. A. (2010). World class contracting (5th ed.). CCH.

PJM 5400 Module 6 instructions, in plain terms

The post-award phase is this assignment's subject, and Part 3 of the course project falls due on the course's final day. Expect to plan or analyze contract administration: a kickoff, performance measures, change management, payment and acceptance, dispute resolution and closeout. Use tables for measures and closeout steps, and walk through at least one change or dispute to show how the process works in practice. Plan how performance will be communicated during the contract, not only measured, and walk through one change from request to modification. Set consequences for each performance measure. Name both parties' contract administrators. Plan the kickoff agenda.

How this PJM 5400 Module 6 example is built

The paper explains why administration matters. Sections plan a kickoff and set five performance measures with standards and consequences, linked to research on measuring supplier performance by total cost. A table walks through a change request for difficult-access meters from request to modification. Sections set payment and acceptance rules and a dispute ladder, and a closeout table lists six steps. The conclusion ties them together. A section on communication sets monthly reviews, quarterly board reports and weekly complaint reviews with the installer, so problems with a crew surface early. A closeout table lists six steps from final acceptance to lessons learned. A change table walks a difficult-access request from submission through sampling and pricing to a signed modification. Payment rules retain ten percent until acceptance.

PJM 5400 Module 6 rubric: what earns full marks

Mentors grade this assignment on a complete administration plan, measures with consequences, a sound change process, attention to payment, disputes and closeout, and clear writing. Papers that walk through a real change, including verification, show practical command. Tying payment to acceptance and retaining funds demonstrates financial control. A closeout that includes vendor evaluation and lessons learned shows a complete life cycle. Plans for regular communication during performance show that administration is active rather than reactive. Verification of a change claim with a sample protects public funds. Retainage tied to acceptance shows financial control. A dispute ladder that ends in mediation shows a plan for disagreement before it happens. Clear tables help.

PJM 5400 Module 6 help: mistakes that cost marks

Students lose points by describing administration in general terms, by setting measures without consequences or by approving changes without verification. Others forget closeout. Set measurable standards with consequences. Walk through a change step by step. Tie payment to acceptance. Close out with warranties, evaluation and lessons. Plan regular performance reviews, and verify any claim for extra work before any money changes hands. Close out with warranty dates recorded and a vendor evaluation filed. Tie every payment to accepted work, and hold back retainage until each zone passes final acceptance. A free first sample on your own PJM-5400 post-award assignment is available on request.

Write yours, or have the desk draft it

This paper is an original model document written by our desk, not a submitted student paper and not an official Thomas Edison State University document. Read it for the moves, then write your own to the instructions in your classroom. If you want one built to your exact prompt and rubric, the first custom sample is free and arrives in 24 to 48 hours.

More PJM 5400 and M.S. in Management in Project Management sample papers

PJM 5400 Module 6 questions, answered

Where can I find a free PJM 5400 Module 6 sample paper?

A contract administration plan for a smart meter program, through closeout, is the assignment above.

What does contract administration include?

Monitoring performance, managing changes, paying for accepted work, resolving disputes and closing out.

Why verify a change request before approving it?

To confirm the extra work is real and priced under the contract before public funds are committed.

What is retainage?

A portion of each payment withheld until final acceptance, protecting the buyer if problems appear.

What happens at contract closeout?

Final acceptance, release of retainage, warranty start, records handover, vendor evaluation and lessons learned.