AVF 4740 Module 2 Blog Entry: Building a Terminal Without Closing the Airport Example

Reviewed by Edgar Pennington, MBA Thomas Edison State University Updated October 2026

This AVF 4740 Module 2 example is a blog entry for AVF-4740, Airport Management II, part of TESU's B.S.B.A. in Aviation Management. Module 2, Airport Design and Construction, covers how airports design facilities and build them while operations continue. The course asks for six blog entries, graded together and usable as the foundation of the final project. This entry follows Cumberland Bay Regional, a fictional county-run field, as it plans to add two gates and a larger holdroom, explaining the design choices, the phasing that keeps flights running and the safety planning required during construction. It ends with a question for classmates.

CourseAVF-4740 Airport Management II
ModuleModule 2
Paper typeBlog entry: airport design and construction
LengthAbout 344 words
FormatDiscussion post with APA 7 citations
SchoolThomas Edison State University
ProgramB.S.B.A. in Aviation Management
UpdatedOctober 2026

Free sample paper for AVF 4740 Module 2

1

Blog entry: Building While Flying

Building While Flying: How a County Airport Expands Its Terminal Without Closing a Gate

Why Expand Now

After a new leisure carrier arrived, Cumberland Bay Regional's single holdroom became crowded on summer weekends, with passengers standing in the corridor. The adaptive master plan had protected land beside the terminal, and boarding passengers passed the trigger for design, so the county approved planning for two new gates.

Design Choices for a Small Terminal

Kwakkel et al. (2010) argue that airport plans should keep options open as conditions change, since airlines and aircraft change faster than buildings. For a small airport that means open holdrooms that can be divided or combined, gates that fit a range of aircraft sizes and space for security screening to grow. The design adds a holdroom that can be split between two flights or used as one, with ground-level boarding by stairs and ramps to avoid the cost of jet bridges.

Phasing: Building While Flying

The hardest part is construction while the terminal stays open. The plan has three phases: first, build the new holdroom behind a temporary wall; second, connect it to the existing building during overnight hours when no flights operate; third, renovate the old holdroom. Each phase keeps at least one usable gate and a clear path for passengers.

Safety During Construction

Construction on an airport brings workers, trucks and cranes near aircraft. The airport prepares a construction safety and phasing plan following FAA guidance, setting where contractors may drive, how barricades mark closed areas, how cranes are checked against airspace limits and how debris is controlled. Contractors are escorted on the airside, the same lesson the airport learned from earlier vehicle deviations. Wells and Young (2011) stress that airside construction must be planned so aircraft operations stay safe throughout.

What this page is doingLinking construction safety back to the airport's earlier vehicle deviations shows classmates how one course topic carries into the next.
2

Budget Honesty

Flyvbjerg et al. (2002) found that cost underestimation on public infrastructure projects is common and persistent. The county's budget therefore includes a contingency and an independent cost estimate before bidding. Have your airports built while flying? I would like to hear how they kept passengers moving.

References

Flyvbjerg, B., Holm, M. S., & Buhl, S. (2002). Underestimating costs in public works projects: Error or lie? Journal of the American Planning Association, 68(3), 279-295. https://doi.org/10.1080/01944360208976273

Kwakkel, J. H., Walker, W. E., & Marchau, V. A. W. J. (2010). Adaptive airport strategic planning. European Journal of Transport and Infrastructure Research, 10(3), 249-273. https://doi.org/10.18757/ejtir.2010.10.3.2891

Wells, A. T., & Young, S. B. (2011). Airport planning and management (6th ed.). McGraw-Hill.

What the AVF 4740 Module 2 instructions ask for

AVF-4740 asks for six blog entries that share one grade, 6 percent of the course, given when the term closes; the syllabus notes they can serve as the foundation for the final project on stakeholders. Module 2, Airport Design and Construction, covers the first, third, sixth, seventh, eighth and eleventh course objectives. A good post here explains a design or construction issue clearly for online readers and connect it to an airport. Construction phasing and safety are practical topics that every airport faces. Since the final project asks how stakeholders function in the airport system, notice who is affected by construction: airlines, passengers, tenants and neighbors. Keep the entry focused on one project so readers can follow its design, phases and safety measures.

How this AVF 4740 Module 2 example is built

The entry starts with why the composite airport is expanding, linking back to the adaptive plan's trigger. A design section uses Kwakkel and colleagues' case for keeping options open to explain a divisible holdroom and ground boarding. A phasing section describes three phases that keep a gate open. A safety section covers the construction safety and phasing plan, barricades, crane height checks and escorts, with a margin note linking it to earlier vehicle deviations. A short section on budget honesty cites Flyvbjerg and colleagues on cost underestimation, and the entry ends with a question to classmates about their airports. Short sections and plain headings keep the entry readable while still citing two sources and the text.

Reading the AVF 4740 Module 2 grading rubric

All six posts share one grade, so keep every entry at the same level. Mentors want correct material on the module's subject, short readable sections and a source behind each main point. An entry that applies design and construction concepts to a specific project, including how operations continue and how safety is managed, shows applied understanding. Noting who is affected by construction prepares the stakeholder project. Inviting comment fits the blog format. References in APA form remain necessary, and facts about federal construction safety guidance should be stated accurately. An entry that shows how construction affects passengers, airlines and tenants also prepares material for the stakeholder project.

AVF 4740 Module 2 help: mistakes that cost marks

Blog entries on construction often describe the finished building and skip how it was built, or ignore safety on the airside entirely. Others are too long for a blog. Pick one project, explain one or two design choices, show how it will be phased and describe the safety measures. Keep it concise, with headings. Cite the text and one research source. Mention the people affected, since the final project will ask about stakeholders. End with a question for classmates. A first construction blog draft for your AVF-4740 airport is free on request. A simple phase list is more useful to readers than a detailed construction schedule.

Write yours, or have the desk draft it

This paper is an original model document written by our desk, not a submitted student paper and not an official Thomas Edison State University document. Read it for the moves, then write your own to the instructions in your classroom. If you want one built to your exact prompt and rubric, the first custom sample is free and arrives in 24 to 48 hours.

More AVF 4740 and B.S.B.A. in Aviation Management sample papers

AVF 4740 Module 2 questions, answered

Where can I find a free AVF 4740 Module 2 sample paper?

That blog entry walks through a terminal expansion at an invented county field while its flights keep running.

How do airports build while staying open?

By phasing construction so at least some gates and paths stay usable, doing connections overnight and separating work areas with barricades.

What is a construction safety and phasing plan?

A plan following FAA guidance that sets contractor routes, barricades, crane height checks, debris control and how operations continue during construction.

Why should airport terminals be designed for flexibility?

Airlines and aircraft change faster than buildings, so spaces that can be divided or combined adapt better over the building's life.

How many blog entries does AVF-4740 require?

Six, graded together at the end of the course.