PJM 7210 Module 2 Midterm Essay Assignment Example

Reviewed by Edgar Pennington, MBA Thomas Edison State University Updated October 2026

This PJM 7210 Module 2 sample paper is the five-question essay midterm for Project Management, covering Modules 1 and 2 through one composite Bergen County water authority's lead service line program. It was written for TESU's Master of Business Administration (MBA). The essays explain why strategy should drive project selection, write a scope statement and deliverable-based work breakdown structure for 1,200 replacements, compare top-down and bottom-up estimates, run a PERT calculation giving about a 97 percent chance of finishing the pilot in 14 weeks, and build a risk register with owners and responses. PJM-7210 is the catalog code. Each essay builds on the one before.

CoursePJM-7210 Project Management
ModuleModule 2
Paper typeMidterm assignment: five essay questions on Modules 1 and 2
LengthAbout 960 words, 6 pages
FormatAPA 7 student paper
SchoolThomas Edison State University
ProgramMaster of Business Administration
UpdatedOctober 2026

Free sample paper for PJM 7210 Module 2

1

Five Questions, One Program: Midterm Essays on Selecting, Scoping, Estimating, Scheduling and Protecting a Lead Line Replacement Project

Student Name

Master of Business Administration, Thomas Edison State University

PJM-7210: Project Management

Mentor Name

Month Day, Year

What this page is doingThe title signals that all five essays are anchored in one project, which keeps the answers concrete. The water authority is a composite.
2

Five Questions, One Program: Midterm Essays on Selecting, Scoping, Estimating, Scheduling and Protecting a Lead Line Replacement Project

The five essays below answer the midterm questions on Modules 1 and 2 of Larson and Gray (2018). Each draws on one example, the lead service line replacement program at Ramapo Valley Water Authority, a composite public utility in Bergen County, New Jersey, which must replace about 1,200 lead lines, including the customer-owned portions, at an estimated $14.4 million.

Essay 1: Why Should Strategy Drive Project Selection?

Larson and Gray (2018) argue that organizations fail when they choose projects one at a time on their individual merits, because the result is a portfolio that spreads scarce resources across too many efforts unrelated to strategy. A disciplined selection process, with projects classified as compliance, operational or strategic and scored on criteria derived from the organization's goals, ensures that resources go where they matter most. Projects that clearly serve strategy also receive stronger support from top management when conflicts over resources arise. At Ramapo Valley, linking selection to the strategic plan explained why smart meters were funded alongside the mandatory lead program: both advanced the plan's aims of cleaner tap water and fewer leaks, and they shared data.

Essay 2: The Scope Statement and the Work Breakdown Structure

Defining scope is the first step of planning, and Larson and Gray (2018) list the elements of a scope statement: the objective, what will be delivered and when, the technical requirements, the boundaries and exclusions of the work, and reviews with the customer. For the lead program, the objective is to replace all 1,200 lead service lines in full within four years and $14.4 million. Deliverables include a verified service line inventory, a customer consent and communication process, completed replacements and restoration of streets and lawns, and post-replacement water testing. Exclusions matter: the program does not replace interior household plumbing or water mains, except where a main must be opened to reach a line. Full replacement is the goal because partial replacement can raise lead levels for a time (Trueman et al., 2016).

A work breakdown structure breaks the scope down level by level until each piece, a work package, can be estimated, scheduled and given to a single owner. A deliverable-based WBS for this program has five branches: inventory, customer engagement, construction by neighborhood phase, restoration and testing, and project management. Construction is broken down by neighborhood so that each phase of about 150 lines becomes a package with its own crew, budget and schedule.

Essay 3: Estimating Times and Costs

Larson and Gray (2018) distinguish top-down estimates, made early from analogies, ratios or expert judgment, from bottom-up estimates built from work packages. The authority's $14.4 million figure is top-down, based on a cost of about $12,000 per line reported by peer utilities. That is appropriate for early approval but not for control. As design proceeds, a bottom-up estimate should be built for each neighborhood package, accounting for local conditions such as street pavement type, lot setbacks and the share of lines under driveways. The textbook also warns about common sources of error: optimism, padding by people who expect cuts, and failing to include contingency for genuine uncertainty. Separate contingency reserves, rather than hidden padding in each package, keep the estimates honest.

Essay 4: Network Planning and PERT

The pilot phase consists of three sequential activities with uncertain durations, estimated in weeks as optimistic, most likely and pessimistic values: inventory verification (2, 3, 6), design and permits (4, 6, 10) and contractor procurement (1, 2, 3). Using the PERT formula, expected time equals the optimistic value plus four times the most likely value plus the pessimistic value, divided by six, and variance equals the square of one-sixth of the range (Malcolm et al., 1959). The expected times are 3.33, 6.33 and 2.00 weeks, for a total of 11.67 weeks, and the variances 0.444, 1.000 and 0.111, for a total of 1.556 and a standard deviation of about 1.25 weeks.

The probability of finishing the pilot within 14 weeks is found from the standard normal value (14 minus 11.67) divided by 1.25, or about 1.87, which corresponds to roughly a 97 percent chance. The board can therefore commit to a 14-week pilot with reasonable confidence, while a 12-week commitment would carry only about a 60 percent chance of being met.

Pilot activity (weeks)OptimisticMost likelyPessimisticExpectedVariance
Inventory verification2363.330.444
Design and permits46106.331.000
Contractor procurement1232.000.111
Total11.671.556

Essay 5: Managing Risk

The textbook's risk management process has four steps: identify risks, assess them for probability and impact, develop responses and control them as the project proceeds (Larson & Gray, 2018). For the lead program, the main risks are homeowners who refuse access to replace the private portion of their lines, unexpected conditions such as lines under foundations, contractor capacity as many utilities replace lines at once, and cost inflation. Responses follow the textbook's categories. Homeowner refusal is mitigated through early outreach, door-to-door visits and assistance with paperwork. Contractor capacity is reduced by awarding multiyear contracts that guarantee volume. Cost inflation is partly transferred through fixed-unit-price contracts and partly retained in a contingency reserve. Each risk receives an owner and a trigger, and the register is reviewed monthly with the steering committee.

Conclusion

Across the five essays, one program shows how Modules 1 and 2 fit together: strategy-driven selection decides that the project is done, a scope statement and WBS define what it delivers, estimates and PERT analysis set realistic budgets and dates, and a risk register protects the plan. Every step rests on the previous one, which is the logic of project planning the midterm is designed to test.

References

Larson, E. W., & Gray, C. F. (2018). Project management: The managerial process (7th ed.). McGraw-Hill Education.

Malcolm, D. G., Roseboom, J. H., Clark, C. E., & Fazar, W. (1959). Application of a technique for research and development program evaluation. Operations Research, 7(5), 646-669. https://doi.org/10.1287/opre.7.5.646

Trueman, B. F., Camara, E., & Gagnon, G. A. (2016). Evaluating the effects of full and partial lead service line replacement on lead levels in drinking water. Environmental Science & Technology, 50(14), 7389-7396. https://doi.org/10.1021/acs.est.6b01912

PJM 7210 Module 2 instructions, in plain terms

The PJM-7210 midterm is a comprehensive assignment of five essay questions on Modules 1 and 2, worth 20 percent of the course grade and submitted by the date in the Course Calendar. Expect questions on the project manager's role, project selection, scope and the work breakdown structure, estimating, network planning and risk. Answer each question fully with the textbook's concepts, and anchor your answers in one example project so they show application rather than recall. Where a question involves calculation, show the formula, inputs and result. Plan an outline for all five questions before writing, so that one project example runs through the whole midterm and each answer can refer back to the others.

How this PJM 7210 Module 2 example is built

The five midterm essays appear in sequence with separate headings, all grounded in one project introduced in a short opening paragraph. The essays use the textbook's terms precisely, such as the elements of a scope statement and the four steps of risk management, and apply them to specific features of the project. A PERT calculation is shown in a table with expected times, variances and a probability, and the conclusion explains how the five topics depend on each other. Calculations appear where they answer the question, not as decoration, and each essay closes with what the result means for the people running the program.

Reading the PJM 7210 Module 2 grading rubric

The midterm assignment carries 20 percent of the PJM-7210 grade and receives a 0 to 100 mark. Mentors look for complete answers to all five questions, accurate use of the course text's concepts, correct calculations with interpretation, and applications that show understanding beyond definitions. Coherence across answers, achieved by using one example, strengthens the paper. Clear headings, APA citations and concise writing complete the grade. Precision with the textbook's vocabulary matters on a midterm, because mentors use it to judge whether concepts have been understood rather than paraphrased loosely. A short conclusion that connects the essays adds polish and shows how planning steps depend on each other.

PJM 7210 Module 2 help from the desk

Midterm essays lose points when they define concepts without applying them, skip parts of multi-part questions or present calculations without explaining what they mean. Answer every part, use one example consistently and show your work for any estimate or probability. Budget your time so the last question gets the same care as the first. Our writers can prepare PJM 7210 midterm essay answers for the questions your mentor assigns. If a question has two or three parts, answer each in its own paragraph so none is missed. For PERT questions, report the expected time, the standard deviation and the probability, and explain what commitment the result supports. Reread the questions before submitting to confirm every part is covered.

Write yours, or have the desk draft it

This paper is an original model document written by our desk, not a submitted student paper and not an official Thomas Edison State University document. Read it for the moves, then write your own to the instructions in your classroom. If you want one built to your exact prompt and rubric, the first custom sample is free and arrives in 24 to 48 hours.

More PJM 7210 and Master of Business Administration sample papers

PJM 7210 Module 2 questions, answered

Where can I find a free PJM 7210 Module 2 sample paper?

The Project Management essay midterm is reproduced above: five answers on selection, scope and WBS, estimating, PERT scheduling and risk, all applied to one water authority project.

How is a PERT expected time calculated?

Weight the most likely duration by four, add the optimistic and pessimistic durations, and divide the total by six.

What is the difference between top-down and bottom-up estimates?

Top-down estimates use analogies, ratios or judgment early in a project; bottom-up estimates add up detailed work package estimates and are more accurate but take longer.

What belongs in a project scope statement?

Its objective, deliverables and milestones, technical requirements, what is excluded, and points where the customer reviews the work.

How much is the PJM-7210 midterm worth?

Twenty percent of the final grade.