NUR 5820 Module 2 Operating Budget Analysis Example

Reviewed by Gwyneth Ollerton, MSN, RN Thomas Edison State University Updated October 2026

This NUR 5820 Module 2 example builds a full operating budget for a 30-bed cardiac telemetry unit and writes every assumption beside the calculation it drives. Prepared for Financial Management in Nursing Practice in the MSN program at TESU, it projects 9,855 patient days from occupancy history, converts volume to staffing with 9.6 hours per patient day, adds a 12% nonproductive rate to reach paid FTEs, adds fixed charge nurse and monitor technician positions, and prices salaries, benefits, supplies and orientation in a table. It explains why overtime is left unbudgeted and how staffing evidence supports the budget. The course appears in the catalog as NUR-5820.

CourseNUR-5820 Financial Management in Nursing Practice
ModuleModule 2
Paper typeOperating budget analysis
LengthAbout 1,073 words, 6 pages
FormatAPA 7 student paper
SchoolThomas Edison State University
ProgramMaster of Science in Nursing
UpdatedOctober 2026

Free sample paper for NUR 5820 Module 2

1

Building Next Year's Telemetry Unit Operating Budget: Volume, Hours per Patient Day, Nonproductive Time and the Assumptions Behind Each Line

Student Name

Master of Science in Nursing (MSN), Thomas Edison State University

NUR-5820: Financial Management in Nursing Practice

Mentor Name

Month Day, Year

What this page is doingThe title lists the inputs in the order the budget is built, which tells the reader how the paper is organized. Naming the assumptions in the subtitle signals that the paper will show its reasoning, not only its totals.
2

Building Next Year's Telemetry Unit Operating Budget: Volume, Hours per Patient Day, Nonproductive Time and the Assumptions Behind Each Line

The first module defined the vocabulary on the telemetry unit's monthly report. This paper uses that vocabulary to build the unit's operating budget for the coming fiscal year. It projects volume, converts volume to staffing hours, adds fixed positions and nonproductive time, prices each line, and estimates supplies and other expenses. Every number rests on an assumption, and each assumption is stated next to the calculation it drives, because a budget that hides its assumptions cannot be defended or revised. Figures are illustrative but built from realistic inputs for the same 30-bed telemetry unit described in Module 1.

Projecting Volume

The budget begins with patient days. The unit has 30 staffed beds. Over the past two years, average occupancy was 88% and 91%, and the hospital's planning office expects a modest increase as a nearby practice begins referring more patients for rhythm monitoring. The budget assumes 90% occupancy, or 30 beds multiplied by 365 days multiplied by 0.90, which gives 9,855 patient days. Seasonal patterns matter for scheduling but not for the annual total: winter months typically run above 95% and late summer near 82%.

This assumption carries more weight than any other, because nearly every variable cost depends on it. If occupancy came in at 85% instead, the unit would see 547 fewer patient days, and a budget that did not flex would show unfavorable variances all year.

Converting Volume to Staffing Hours

The hospital's staffing standard for telemetry is 9.6 hours per patient day, counting direct-care registered nurses and patient care technicians combined. This target was set by the nursing department after benchmarking against similar units and reflects our usual pattern of one RN for four patients and one technician for eight. Multiplying 9,855 patient days by 9.6 gives 94,608 productive hours, or 45.5 productive FTEs.

Productive hours are not paid hours. Nurses take vacation, holidays and sick time, attend education, and orient new staff, and someone must work those shifts. The unit's nonproductive rate over the past two years averaged 12% of paid hours. Dividing productive hours by 0.88 gives 107,509 paid hours, or 51.7 paid FTEs for variable direct-care staff. The skill mix assumption splits these hours 65% RN and 35% technician.

The 9.6 standard is an average. Day shifts usually carry more hours than nights because of admissions, discharges, procedures and rounds, so the schedule will place more staff on days while the annual total still matches the budget. The manager should check that the shift-by-shift pattern adds up to the budgeted hours before submitting the budget, because a pattern that exceeds the total will produce unfavorable variances from the first month.

What this page is doingThe paper converts productive hours to paid hours explicitly. Leaving out nonproductive time is the most common error in student operating budgets and usually costs points.
3

Fixed Positions

Some positions do not vary with census. The unit needs a charge nurse and a monitor technician on every shift, around the clock, regardless of how many patients are present. Each 24-hour position requires 8,760 productive hours a year, or 9,955 paid hours after the same nonproductive adjustment, which is 4.8 paid FTEs per position. A unit secretary covers days and evenings, about 2,912 hours a year, and the nurse manager is a salaried position.

Pricing the Lines

Salaries are priced from the hospital's wage scale, using the average rate for each job class with a 3% midyear merit increase averaged across the year, plus a 6% allowance for shift and weekend differentials. The direct-care RN average is $47.50 an hour, the charge RN $52.00, the patient care technician $21.00 and the monitor technician $22.00. The finance office loads health coverage, pension matching and employer payroll tax onto every salary dollar; these benefits are budgeted at 30% of salaries, as directed by the finance department.

Supplies are budgeted per patient day. Last year's medical and surgical supply cost averaged $30.10 per patient day; with an expected vendor price increase of about 3%, the budget uses $31.00, giving $305,505. Education, orientation and minor equipment are budgeted at $74,000, which reflects an expected four new graduate hires. Jones (2008) showed how nurse turnover costs measured in an earlier year can be adjusted for inflation with the Consumer Price Index, which helps a manager estimate what replacing departing nurses will cost when a new study is not practical; our orientation line uses the same reasoning.

Two smaller items complete the picture. Salary increases granted midyear are averaged over the year rather than applied to all twelve months, and differentials are estimated from last year's actual share of night and weekend hours. Small differences in these assumptions can move the salary line by tens of thousands of dollars, which is why each is written down.

LinePaid hoursPaid FTEAnnual cost
Direct-care RNs (65% of variable hours)69,88133.6$3,518,504
Patient care technicians (35%)37,62818.1$837,603
Charge RNs (fixed, 24/7)9,9554.8$548,695
Monitor technicians (fixed, 24/7)9,9554.8$232,140
Unit secretaries (days and evenings)2,9121.4$58,240
Nurse manager (salaried)2,0801.0$132,000
Benefits at 30% of salaries$1,598,154
Medical and surgical supplies ($31 per patient day)$305,505
Education, orientation and minor equipment$74,000
Total direct operating expense63.7$7,304,841

What the Budget Leaves Out and Why It Matters

The budget does not plan for overtime or agency nurses. Overtime is not a planned cost; it is a variance that appears when vacancies, sick calls or unexpected census exceed what the schedule covers. Bae and Fabry (2014) reviewed research on nurse work hours and found strong evidence linking long hours and overtime to adverse outcomes for nurses, though evidence for patient outcomes was less conclusive. Treating overtime as unplanned keeps it visible on the monthly report and supports the case for filling vacancies.

The budget is also a statement of value. Dall et al. (2009) estimated that higher registered nurse staffing reduces complications and length of stay, producing medical cost savings that are rarely credited to nursing budgets. When finance asks whether the unit can trim hours per patient day, the manager can point to that evidence and to the unit's own outcomes.

Conclusion

The proposed operating budget totals about $7.3 million, or roughly $741 per patient day, for 63.7 paid FTEs. Its most important assumptions are 90% occupancy, 9.6 hours per patient day, a 12% nonproductive rate and a 65/35 skill mix. If any of these change, the budget should be revised, and the flexible budget used in the variance module will show how.

References

Bae, S.-H., & Fabry, D. (2014). Assessing the relationships between nurse work hours/overtime and nurse and patient outcomes: Systematic literature review. Nursing Outlook, 62(2), 138-156. https://doi.org/10.1016/j.outlook.2013.10.009

Dall, T. M., Chen, Y. J., Seifert, R. F., Maddox, P. J., & Hogan, P. F. (2009). The economic value of professional nursing. Medical Care, 47(1), 97-104. https://doi.org/10.1097/mlr.0b013e3181844da8

Jones, C. B. (2008). Revisiting nurse turnover costs: Adjusting for inflation. JONA: The Journal of Nursing Administration, 38(1), 11-18. https://doi.org/10.1097/01.nna.0000295636.03216.6f

NUR 5820 Module 2 instructions, in plain terms

Module 2 in NUR-5820 typically centers on the operating budget, either building one or critiquing one. Directions may give you a case with census figures and wage rates, or ask you to build a budget for your own unit using illustrative numbers. Expect to project volume, calculate staffing in hours and FTEs, include nonproductive time, price salaries and benefits, budget supplies and explain assumptions. Some sections want a spreadsheet submitted with the paper. Read the course page for whether a template is provided, which hours per FTE to use, and how benefits should be calculated. Show your calculations so the mentor can follow them. Note any hospital-wide assumptions, such as raises, that finance supplies.

How the NUR 5820 Module 2 example is put together

The paper builds the budget in the same order a manager would: volume first, then hours, then dollars. The volume section states the occupancy assumption and its sensitivity. The staffing section converts patient days to productive hours and then to paid hours using a nonproductive rate. Fixed positions are added separately with their own calculation. The pricing section explains wage, differential, benefit and supply assumptions and presents a table of every line. A section on what the budget omits explains the treatment of overtime with evidence. The conclusion restates the total, cost per patient day and the key assumptions to watch. Short notes explain how averages and midyear changes were handled.

Where the marks sit in the NUR 5820 Module 2 rubric

Operating budget assignments are generally scored on correct calculations, a logical build from volume to staffing to cost, inclusion of nonproductive time and fixed positions, clearly stated and reasonable assumptions, an organized presentation such as a table, explanation of the manager's decisions, and APA format. Mentors check arithmetic and whether productive and paid hours are distinguished. Budgets that explain their assumptions score better than those that only present totals. Connecting the budget to evidence on staffing and outcomes demonstrates graduate-level leadership thinking. A missing or mismatched table total is a common reason for lost points. A short sensitivity note on the volume assumption is often credited.

NUR 5820 Module 2 help from the desk

The error that costs students most in this module is budgeting only productive hours, which understaffs the unit by the size of the nonproductive rate. A second is mixing fixed and variable positions into one hours-per-patient-day figure. A third is listing totals without showing how they were reached. Check each calculation twice and make sure the table total matches the text. If your directions provide a case, use its numbers exactly rather than substituting your own. Keep assumptions realistic and say where each came from. The desk can build an operating budget and paper from your case data or unit details. Make sure your shift pattern adds up to the budgeted hours.

Write yours, or have the desk draft it

This paper is an original model document written by our desk, not a submitted student paper and not an official Thomas Edison State University document. Read it for the moves, then write your own to the instructions in your classroom. If you want one built to your exact prompt and rubric, the first custom sample is free and arrives in 24 to 48 hours.

More NUR 5820 and Master of Science in Nursing sample papers

NUR 5820 Module 2 questions, answered

Where can I find a free NUR 5820 Module 2 sample paper?

The complete operating budget paper for a telemetry unit is above, with a priced table and margin notes. Follow its volume, hours, positions, pricing order for the budget your directions ask for.

How do you calculate nursing FTEs from patient days?

Patient days times the hours-per-patient-day target gives the hours that must be worked; dividing by the worked share of paid time converts them to paid hours, and 2,080 paid hours make one FTE.

What is a nonproductive rate?

The share of paid hours not spent working, such as vacation, holidays, sick time, education and orientation. Budgets that leave it out underestimate the staff needed.

Why are charge nurses budgeted as fixed positions?

Because the unit needs a charge nurse on every shift regardless of census. Their hours do not rise or fall with patient days, so they are added separately from variable staffing.

Should overtime be included in an operating budget?

Many hospitals do not budget overtime and treat it as a variance, which keeps it visible on monthly reports. Some include a small allowance; follow your organization's practice and explain the choice.