MSM 6200 Module 6 Final Project: A Change the Warehouse Should Make, and How to Make It Stick Example

Reviewed by Edgar Pennington, MBA Thomas Edison State University Updated October 2026

This MSM 6200 Module 6 example is the final project in Leading Strategic Change, the closing paper of a course in TESU's Master of Science in Management, presented with the module on sustaining change. MSM-6200 asks students to complete a final project on a change their selected organization should make, drawing on the course's model of the change process. The paper recommends that the composite Carteret logistics warehouse followed all term expand robotic picking from one pilot zone to the whole building while redesigning work around the robots. It presents the case for change, summarizes the diagnosis, addresses the people issues, plans the rollout and sets out how to sustain the change through measures, roles, pay and continued learning.

CourseMSM-6200 Leading Strategic Change
ModuleModule 6
Paper typeFinal project: leading a strategic change in a selected organization
LengthAbout 1,116 words, 7 pages
FormatAPA 7 student paper
SchoolThomas Edison State University
ProgramMaster of Science in Management
UpdatedOctober 2026

Free sample paper for MSM 6200 Module 6

1

From One Zone to the Whole Building: Leading and Sustaining the Warehouse's Move to Robotic Picking

Student Name

Master of Science in Management, Thomas Edison State University

MSM-6200: Leading Strategic Change

Mentor Name

Month Day, Year

What this page is doingThe title states the change the final project recommends and its central concern, keeping the change in place after the rollout.
2

From One Zone to the Whole Building: Leading and Sustaining the Warehouse's Move to Robotic Picking

The Change Recommended

After a nine-month program of reslotting, new training and pay, and a one-zone robot pilot, the warehouse should expand autonomous mobile robots to all twelve picking zones over eighteen months, and redesign picker roles so that experienced pickers become zone leads and robot technicians.

The Case for Change

Our largest client requires 97 percent of orders shipped before its 4 p.m. cutoff. Before the change program, we shipped 94 percent on time, picker turnover was high and walking consumed 41 percent of pickers' time. The pilot zone reached 98 percent on time, cut walking to under 10 percent of a shift and kept all six pilot pickers. A competitor nearby already uses robots, and two other clients have asked about our plans.

Alternatives Considered

Two alternatives were weighed. The first is to keep robots in the pilot zone only and rely on reslotting and the new pay system in the other eleven zones. That option costs least, and reslotting alone brought walking down to 32 percent of a shift, but manual zones still ship only about 95 percent of orders before the cutoff, a gap the other measures have not closed. The second is to send peak volume to a partner warehouse, which would protect the cutoff during the holidays but would hand the client's orders to a competitor and weaken our case for renewal. Expansion is the only option that meets the client's target in every zone and every season, and it is the one our pilot pickers themselves recommended at the month nine review.

Costs and Returns

Leasing robots for the remaining eleven zones would cost about $104,500 a month at full scale, phased in over eighteen months. Against that, the pilot zone cut overtime by 60 percent and turnover to near zero, and our finance team estimates savings in overtime, recruiting and missed-cutoff penalties of about $1.5 million a year at full scale. The larger return is the client contract, worth $11 million in annual revenue, and the chance to win the two clients who have asked about robots.

Diagnosis

Module 2's congruence diagnosis (Nadler & Tushman, 1980) found that the missed cutoffs came from four misfits: an outdated layout, thin training, incentive pay that punished careful pickers near the cutoff and an informal culture that hoarded know-how. The program addressed each, and the pilot showed that robots work best when those misfits are fixed first.

People and Politics

Hayes (2022) emphasizes that the people issues decide whether change succeeds. The main stakeholder concerns remain jobs, skills and control. Pickers fear that full expansion will reduce headcount. Oreg et al. (2011) found that perceived harms drive reactions to change, so the commitment must be specific: headcount will fall only through attrition, no picker will lose a job because of the robots and every picker will be offered training for new roles. Supervisors fear managing a fully robotic floor; they will be trained first. The general manager wants fast expansion; the plan offers a schedule with gates so that speed does not repeat the integration failures of the pilot's bad week. Communication will follow the pattern that worked during the pilot: plain reports of progress and problems on every shift, and a standing invitation for pickers to propose changes.

Implementation Plan

Each phase uses a pilot team of pickers from the affected zones, the practice that helped the first pilot recover from its setback. Battilana et al. (2010) found that leaders need different competencies at different stages; the plan assigns the operations manager to mobilize and communicate, and a cross-functional review team to evaluate each phase.

PhaseMonthsScopeGate
A1-6Four more zones, chosen by order volumeCutoff performance and retention hold in new zones
B7-12Four more zones; first zone leads appointedIntegration runs a month without major outage
C13-18Final four zones; manual picking kept only for oversized itemsClient cutoff target met for three consecutive months

Sustaining the Change

Buchanan et al. (2005) reviewed studies of how organizational changes are sustained and found that changes fade when they rest on a few champions, when their supporting conditions are withdrawn and when they clash with existing systems. The plan therefore builds the change into the warehouse's systems.

Rafferty et al. (2013) note that readiness must be sustained at group as well as individual levels; zone teams with shared measures give each group a reason to keep the change working.

Risk of decaySupport built into the plan
Change depends on the operations managerZone leads own their zones' performance; review team continues after rollout
Old pay system returns under budget pressurePay for speed and accuracy written into the warehouse's compensation policy
Skills fade or concentrate in a few peopleRobot technician certification for at least two people per shift
Measures drift back to totals onlyDaily zone dashboards for cutoff, accuracy and robot uptime
Learning stops after rolloutQuarterly improvement sessions where pickers propose workflow changes
What this page is doingUsing research on why changes decay to design specific supports, rather than ending the plan at rollout, answers the module's question about how change is made to stick.
3

Risks

The main risks are technical, a repeat of integration failures at larger scale; financial, if a client is lost and volume drops; and human, if the attrition commitment proves impossible in a slow year. Each phase gate allows the plan to pause, and the attrition commitment will be revisited openly with pickers rather than quietly broken.

Evaluating the Change

Evaluation will run at two levels. Each phase gate tests whether the change works in the zones just converted. A broader review at month eighteen, and again a year later, will ask whether the change has held: whether the cutoff target is met without overtime, whether retention stays above 75 percent and whether pickers' ratings of their work have held or fallen. Buchanan and colleagues note that decay can be gradual and unnoticed, so the review a year later matters as much as the gates.

What the Course Changed in This Plan

At the start of the course, leaders wanted to buy robots within a week. Diagnosis, stakeholder mapping and the pilot changed that plan in three ways: the robots now come after the misfits are fixed, pickers help shape each phase, and the plan ends with supports for sustaining the change rather than with the last installation.

Conclusion

The warehouse should expand robotic picking to the whole building because the pilot showed it meets the client's requirement and keeps pickers when the earlier misfits are fixed. The plan addresses people and politics with specific commitments, phases the rollout with gates and sustains the change by building it into roles, pay, measures and continued learning rather than leaving it to its champions.

References

Battilana, J., Gilmartin, M., Sengul, M., Pache, A.-C., & Alexander, J. A. (2010). Leadership competencies for implementing planned organizational change. Leadership Quarterly, 21(3), 422-438. https://doi.org/10.1016/j.leaqua.2010.03.007

Buchanan, D., Fitzgerald, L., Ketley, D., Gollop, R., Jones, J. L., Lamont, S. S., Neath, A., & Whitby, E. (2005). No going back: A review of the literature on sustaining organizational change. International Journal of Management Reviews, 7(3), 189-205. https://doi.org/10.1111/j.1468-2370.2005.00111.x

Hayes, J. (2022). The theory and practice of change management (6th ed.). Bloomsbury.

Nadler, D. A., & Tushman, M. L. (1980). A model for diagnosing organizational behavior. Organizational Dynamics, 9(2), 35-51. https://doi.org/10.1016/0090-2616(80)90039-X

Oreg, S., Vakola, M., & Armenakis, A. (2011). Change recipients' reactions to organizational change: A 60-year review of quantitative studies. Journal of Applied Behavioral Science, 47(4), 461-524. https://doi.org/10.1177/0021886310396550

Rafferty, A. E., Jimmieson, N. L., & Armenakis, A. A. (2013). Change readiness: A multilevel review. Journal of Management, 39(1), 110-135. https://doi.org/10.1177/0149206312457417

MSM 6200 Module 6 instructions, in plain terms

The MSM-6200 final project, worth 24 percent of the grade, focuses on a change your selected organization should make, with full guidelines and a rubric in the course's Final Project area. Two of your written assignments help build it. You will argue for the change, diagnose the organization, deal with the people issues, plan the rollout and show how the change will last. Use the organization you followed through the course, integrate your earlier work into one argument and draw on Hayes's model and research throughout. Plan for a long paper. Include the alternatives you rejected, the costs and returns of the recommended change, and how you will know, a year after rollout, whether the change has held.

How the MSM 6200 Module 6 example is put together

The paper states the recommended change, then makes the case with numbers from before and during the pilot. Sections summarize the diagnosis and the people issues with specific commitments. A table sets out three phases with gates, and research on leadership competencies assigns roles. A sustaining section uses research on why changes decay and a table of risks and supports. Risks and a conclusion follow, linking the recommendation to the evidence gathered across the course. Sections on alternatives considered and on costs and returns explain why expansion beats a smaller option and outsourcing. An evaluation section sets reviews at month eighteen and a year later, and a closing reflection names three ways the course changed the original plan.

MSM 6200 Module 6 rubric: what earns full marks

Mentors grade the final project on a clear and well-supported case for change, integration of diagnosis, people issues and planning, a realistic implementation plan, a convincing approach to sustaining change and clear writing. Papers that design sustaining supports from research on why changes decay show mastery of the course's final module. Specific commitments to people, and gates in the plan, demonstrate realism. Integration of earlier assignments into one argument earns more than repeating them, and accurate citations support every major claim. Comparing the recommendation with realistic alternatives, and costing it, shows that the change was chosen rather than assumed. An evaluation plan that looks beyond rollout links the paper to the final module's question of how change lasts.

MSM 6200 Module 6 help: mistakes that cost marks

Students lose points by stopping at implementation without addressing how the change will last, by recommending a change without evidence or by ignoring the people issues. Others stack earlier assignments without integrating them. Make the case with data. Show how the diagnosis shapes the plan. Make specific commitments to people. Build the change into systems so it outlasts its champions. Weigh at least two alternatives, cost the recommendation and set out how its lasting effects will be measured. Weave the earlier modules together so the diagnosis, the stakeholder map and the plan make one case for one change, each part building on the last. A free first sample on your own MSM-6200 final project is available on request.

Write yours, or have the desk draft it

This paper is an original model document written by our desk, not a submitted student paper and not an official Thomas Edison State University document. Read it for the moves, then write your own to the instructions in your classroom. If you want one built to your exact prompt and rubric, the first custom sample is free and arrives in 24 to 48 hours.

More MSM 6200 and Master of Science in Management sample papers

MSM 6200 Module 6 questions, answered

Where can I find a free MSM 6200 Module 6 sample paper?

A plan to expand robotic picking across a warehouse and sustain the change is the final project above.

What does the MSM-6200 final project require?

A paper on a change the selected organization should make, with the case, diagnosis, people issues, implementation plan and means of sustaining it.

Why do organizational changes decay?

Research finds they decay when they depend on a few champions, when supporting conditions are removed and when they conflict with existing systems.

How can change be sustained?

By building it into roles, pay, measures and routines so it does not depend on its original champions.

How much is the MSM-6200 final project worth?

Twenty-four percent of the course grade.