PJM 5100 Project Management sample papers, module by module

Reviewed by Edgar Pennington, MBA · Project Management · Thomas Edison State University · Free custom samples in 24–48h

PJM-5100 approaches project management as a manager who must deliver scope, schedule and budget through other people. The samples here answer the course’s written assignments with Gido, Clements and Baker’s methods, worked on realistic projects.

Send the exact assignment or rubric from your classroom and a custom sample written to it lands in 24 to 48 hours, the first one free. PJM-5100 is TESU’s Project Management course. Its six graduate modules span project fundamentals, proposals and bidding, project structure, resource management, project personnel, and project communications and organizational issues. Searches like "pjm 5100 module 3 assignment example", "PJM5100 sample paper", and "PJM-5100 module samples" land on this page.

What PJM-5100 is really about

The course uses Gido, Clements and Baker’s Successful Project Management, which follows a project’s life cycle from identifying a need and preparing a proposal through planning, scheduling, resource use, cost control and closure, with chapters on the project manager, the team and communication. Module 1 covers fundamentals and the life cycle, Module 2 requests for proposals, bidding and the project overview, Module 3 scope, work breakdown structures and schedules, Module 4 resource leveling and cost, Module 5 the project manager and team, and Module 6 communication and organizational structures.

Students also practice with project scheduling software, so samples present schedules and resource tables in a form a tool would produce. The final paper is an executive report to company vice presidents and directors on how the student’s team will manage a project, which rewards clear, high-level writing backed by detailed plans.

What PJM-5100’s assessments ask for

Six written assignments, one per module and worth 45 percent of the grade together, apply the chapter methods to a project, from a proposal to a schedule, resource plan or communication plan. Six discussions count 20 percent and a 10- to 12-page executive project management report counts 35 percent.

Where students lose points in PJM-5100

Assignments lose points when schedules lack dependencies or durations, when resource conflicts are ignored, or when cost estimates have no basis. Another weakness is writing about project management in general instead of applying a method to a specific project. Mentors look for plans that could be used, with clear assumptions.

The PJM-5100 drawers

Module 1

PJM-5100 Module 1 assignment example

A composite Iowa credit union's ninth branch, defined as a project with a measurable objective ($2.85 million, open by September 30 with drive-up service and 6 staff), mapped to Gido, Clements and Baker's four life cycle phases with stakeholders, constraints and success factors, using research on top management support and cost overruns to set a 10 percent contingency and a sponsor. Full sample paper, read it free.

Read the sample →
Module 2

PJM-5100 Module 2 assignment example

The composite credit union's branch moves to procurement: a request for proposal for a general contractor with its statement of work, deliverables, schedule and evaluation criteria, a fixed-price contract justified by a complete design, three bids of $1.86 to $2.02 million scored 8.4, 7.8 and 7.4 on weighted criteria, and a project overview with a $2.85 million budget including a $260,000 contingency. Full sample paper, read it free.

Read the sample →
Module 3

PJM-5100 Module 3 assignment example

The composite credit union branch broken into a six-part work breakdown structure, a responsibility matrix for five roles and an 11-activity network in which the contractor's 22-week build drives a 29-week critical path to opening against a 30-week target, with 9 weeks of slack in hiring and training and 14 in equipment ordering. Full sample paper, read it free.

Read the sample →
Module 4

PJM-5100 Module 4 assignment example

The composite credit union branch at week 14: a network engineer double-booked in weeks 0 to 6, solved by moving network design into its 20 weeks of slack; a $2.59 million base budget by work package; and a status report with $1.28 million budgeted, $1.205 million earned and $1.262 million spent, a cost performance index of 0.95, construction a week behind on the critical path and a forecast cost of about $2.71 million, within the contingency. Full sample paper, read it free.

Read the sample →
Module 5

PJM-5100 Module 5 assignment example

The composite credit union branch team of five functional managers and a new branch manager, analyzed through the project manager's planning, organizing and controlling duties, Tuckman's stages of team development and research on psychological safety, with a team charter, a facilitated resolution of a facilities-versus-technology dispute over installation access, and a plan for early warning of problems. Full sample paper, read it free.

Read the sample →
Module 6

PJM-5100 Module 6 assignment example

The composite credit union branch in its final months: a communication plan matching nine stakeholders to reports, meetings and channels, a change control procedure with thresholds, and an analysis showing the project runs as a weak matrix inside a functional organization, with research favoring stronger project authority and on project managers' communication competence, leading to a sponsor-backed balanced matrix for future branches. Full sample paper, read it free.

Read the sample →
Different?

Your classroom shows something else?

Thomas Edison State University revises courses; module counts and deliverables shift between terms. Send what your classroom shows and the desk matches it exactly.

Send it over →

Using a PJM-5100 sample the right way

Send your module’s written assignment and the project you are using, and a first custom sample comes back free inside 24-48h. Read it to see a method applied step by step to one project with stated assumptions. Then plan your own project the same way.

How these samples are written

Project samples here apply Gido, Clements and Baker’s methods to one realistic project, with tables a scheduling tool would produce and assumptions stated. Requests follow your module’s assignment.

PJM-5100 questions, answered

What textbook does PJM-5100 use?

Gido, Clements and Baker’s Successful Project Management, seventh edition, from Cengage.

What is the PJM-5100 final paper?

A 10- to 12-page executive project management report to company vice presidents and directors applying the course’s principles.

Does PJM-5100 use project software?

Students practice scheduling with project management software, and assignments often include schedules and resource tables.