HCM 4040 Module 3 Continuous Improvement Paper Example

Reviewed by Edgar Pennington, MBA Thomas Edison State University Updated October 2026

This HCM 4040 Module 3 example takes the Continuous Improvement written assignment and applies the improvement cycle to missed therapy sessions at a composite New Jersey rehabilitation hospital. TESU offers the course, Healthcare Quality and Outcomes: Measurement and Management, as part of the B.S. in Healthcare Management. The paper starts from an audit showing 9% of sessions lost, weighs published studies on missed therapy and therapy intensity, and diagrams the cycle in a table that names the tool used at each stage, from flowchart and Pareto chart to cause-and-effect diagram and run chart. Three linked test cycles follow, each with a prediction and a decision. In the university's catalog the course appears as HCM-4040.

CourseHCM-4040 Healthcare Quality and Outcomes Measurement and Management
ModuleModule 3
Paper typeWritten assignment: continuous improvement
LengthAbout 1,155 words, 7 pages
FormatAPA 7 student paper
SchoolThomas Edison State University
ProgramB.S. in Healthcare Management
UpdatedOctober 2026

Free sample paper for HCM 4040 Module 3

1

Nine Percent of Sessions Lost: Running the Improvement Cycle on Missed Therapy at a Rehabilitation Hospital

Student Name

B.S. in Healthcare Management, Thomas Edison State University

HCM-4040: Healthcare Quality and Outcomes: Measurement and Management

Mentor Name

Month Day, Year

What this page is doingOpening with the baseline figure tells the mentor the paper is grounded in data from the first line. The subtitle names the method and the setting.
2

Nine Percent of Sessions Lost: Running the Improvement Cycle on Missed Therapy at a Rehabilitation Hospital

At Rancocas Valley, a fictional South Jersey rehabilitation hospital with 58 beds, the quality council noticed that the stroke and brain injury units were losing therapy time. An audit of eight weeks of scheduling records showed that 9% of scheduled physical, occupational and speech therapy sessions on those two units did not happen or ended early. Every lost session matters in a setting where patients are admitted because they need, and Medicare expects them to receive, an intensive daily program. This paper diagrams the continuous improvement cycle the hospital used to tackle the problem, explains which tool was chosen at each step and why, and reports three linked cycles of testing.

Why Lost Sessions Are Worth Improving

Published work suggests that the problem is common and that therapy time is linked to recovery. Byrd et al. (2025) followed patients on an academic stroke rehabilitation unit and counted 184 missed sessions, about 5% of those scheduled, with physical therapy missed most often. In a larger study of spinal cord injury rehabilitation across six centers, Hammond et al. (2013) found that patients missed an average of about two and a half hours of therapy a week, most often because the patient was not ready or for medical reasons. On the outcome side, MacDonald et al. (2024) studied 12,770 stroke patients in Ontario rehabilitation facilities and found that more minutes of daily therapy were associated with larger functional gains and more discharges back to the patient's prior home, though the added benefit flattened above about 95 minutes a day. Byrd et al. did not find a correlation between missed sessions and functional scores in their smaller sample, so the hospital's case rests on compliance, efficiency and the broader evidence on intensity rather than on a proven effect of each missed session.

What this page is doingThe literature is used honestly: one study supports the link between therapy time and outcomes, and another found no correlation in its own sample. Mentors credit students who report what evidence does not show.
3

The Improvement Cycle Diagrammed

The hospital follows the Plan, Do, Study, Act cycle inside a larger loop of continuous improvement: understand the current process, set an aim, test changes in small cycles, measure, and either adopt, adapt or drop each change before starting the next cycle. The table summarizes the loop as it was applied to missed therapy, with the tool used at each stage.

StageQuestionTool chosenResult at Rancocas Valley
UnderstandWhat happens before a session starts?Flowchart of the morning from waking to first therapyEleven handoffs between waking and the gym
UnderstandWhich reasons matter most?Pareto chart of eight weeks of missed sessionsThree reasons caused 73% of losses
UnderstandWhy is a patient not ready?Cause-and-effect diagram built with night and day nursesBathing, medications and late breakfast trays
AimHow much, by when?Written aim statementMissed sessions from 9% to 5% within four months
TestDoes a change work here?Plan, Do, Study, Act cyclesThree linked cycles, described below
MonitorIs the change holding?Run chart of weekly missed sessionsReviewed at each monthly council meeting
What this page is doingA table is the clearest way to diagram a cycle in a written paper, and it lets the student show tool selection, the fifth course objective, at a glance.
4

Choosing the Right Tool for Each Question

Each tool was chosen because it answers one question well. A flowchart was the right first step because nobody on the team had seen the whole morning; therapists saw only late arrivals, nurses saw only the rush. The Pareto chart came next because the audit produced a long list of reasons, and the team needed to know which few accounted for most of the lost time. It showed that patient fatigue or refusal caused 31% of missed sessions, a patient not being ready at the scheduled time caused 24%, and off-unit appointments such as dialysis and imaging caused 18%. Therapist absence, which managers had assumed was the main cause, accounted for only 11%.

For the largest controllable cause, readiness, the team used a cause-and-effect diagram, because the reasons a patient is not ready cross several departments: nursing, dietary, pharmacy and transport. A run chart was preferred to a control chart for monitoring during the tests because only a few weeks of data would be available at first and the team needed a simple picture it could update by hand.

Three Cycles of Testing

Cycle 1 tested a readiness routine on one hallway of the stroke unit for one week. The plan predicted that if the night nurse completed bathing for patients with early therapy sessions and the day nurse gave morning medications by 7:45, at least nine of ten patients would be ready on time. In practice, eight of ten were ready on the first two days and nine of ten after the breakfast trays for that hallway were moved earlier. Studying the results, the team found the routine worked but added work to the night shift, so they adapted it by limiting early bathing to patients scheduled before 9:00. The adapted version was then tested on the whole stroke unit for two weeks.

Cycle 2 addressed off-unit appointments. The team predicted that sharing the dialysis schedule with the therapy schedulers a day ahead would prevent most dialysis conflicts. For two weeks, the unit secretary sent the next day's dialysis times to the therapy office by 2:00 p.m. Conflicts dropped from about six a week to one, and the change was adopted. Imaging conflicts, which depend on the acute hospital's schedule, were left for a later cycle.

Cycle 3 tested splitting therapy for patients who tired quickly. For patients identified by their therapists as fatigue-limited, a 60-minute session was divided into two 30-minute sessions with rest between. Over two weeks on the brain injury unit, sessions cut short by fatigue fell, but scheduling two sessions strained the gym's afternoon capacity. The team adapted the change to apply only to patients in their first week after admission.

What this page is doingEach cycle states a prediction before the test, reports what happened and names the decision. That sequence is what separates a real improvement cycle from a description of a project.
5

Results and What the Cycle Teaches

Over four months, the weekly share of missed sessions on the two units fell from 9% to just under 6%, with the run chart showing a sustained shift after the second cycle. The aim of 5% was not met, and the remaining losses come mostly from fatigue and imaging, which will be the subject of the next round. Reed and Card (2016) warn that improvement cycles are often run as one large project labeled with the cycle's name, without the small, rapid, linked tests the method requires. Taylor et al. (2014) reached a similar conclusion after reviewing published uses of the method, finding that few reports showed a series of cycles building on one another. The Rancocas Valley work tried to avoid that trap by keeping each test small and letting each one shape the next.

Conclusion

Diagramming the improvement cycle forced the team to understand the morning before changing it, and choosing each tool for a specific question kept the work focused on the few causes that mattered. Three small cycles, each with a prediction, a test and a decision, produced a real but partial improvement and a clear starting point for the next round.

References

Byrd, E., Khalidi, S., Azuero, A., Chambers, A., Killingsworth, R., & Jablonski, R. (2025). Frequency and reasons for missed inpatient stroke rehabilitation therapy sessions. Rehabilitation Nursing Journal, 50(3), 98-105. https://doi.org/10.1097/RNJ.0000000000000498

Hammond, F. M., Lieberman, J., Smout, R. J., Horn, S. D., Dijkers, M. P., & Backus, D. (2013). Missed therapy time during inpatient rehabilitation for spinal cord injury. Archives of Physical Medicine and Rehabilitation, 94(4, Suppl. 2), S106-S114. https://doi.org/10.1016/j.apmr.2012.12.023

MacDonald, S. L., Linkewich, E., Bayley, M., Jeong, I. J., Fang, J., & Fleet, J. L. (2024). The association between inpatient rehabilitation intensity and outcomes after stroke in Ontario, Canada. International Journal of Stroke, 19(4), 431-441. https://doi.org/10.1177/17474930231215005

Reed, J. E., & Card, A. J. (2016). The problem with Plan-Do-Study-Act cycles. BMJ Quality & Safety, 25(3), 147-152. https://doi.org/10.1136/bmjqs-2015-005076

Taylor, M. J., McNicholas, C., Nicolay, C., Darzi, A., Bell, D., & Reed, J. E. (2014). Systematic review of the application of the plan-do-study-act method to improve quality in healthcare. BMJ Quality & Safety, 23(4), 290-298. https://doi.org/10.1136/bmjqs-2013-001862

HCM 4040 Module 3 instructions, in plain terms

HCM-4040 Module 3, Continuous Improvement, is tied to the fourth and fifth course objectives: diagramming the cycle of continuous quality improvement and telling improvement tools apart so the right one is used for the right job. Expect the written assignment to ask you to pick a problem, lay out the improvement cycle step by step, and explain which tools you would use and why. Some versions ask for a diagram; a table or a labeled figure in the paper satisfies that. Because this assignment is weighted at 8% of the course grade, mentors expect a full paper with sources, not a short answer. Follow the exact prompt in your course site and format the paper in APA.

How this HCM 4040 Module 3 example is built

The sample begins with a measured problem rather than a general topic, so the cycle has something to improve. A literature section reports what three studies found about missed sessions and therapy intensity, including a result that cuts against the argument. The improvement cycle appears as a six-row table showing each stage, the question asked, the tool picked and what it revealed. A separate section defends each tool choice, which is the part many papers skip. Three test cycles are written in the same order, prediction, test, findings and decision, and one change is adapted rather than adopted. The results section admits the aim was missed and uses two critiques of how the method is often misused to judge the project.

Where the marks sit in the HCM 4040 Module 3 rubric

Mentors grading HCM 4040 Module 3 look first for a cycle that is actually diagrammed, not described in a sentence, and for a problem specific enough to measure. Next comes tool selection: each tool should be matched to a question, with a reason, which is exactly what the fifth course objective names. Papers that report a test with a prediction and a decision show real understanding of the method. Use of evidence counts, and so does honesty about what the evidence shows. Clear headings, a logical flow from problem to results, accurate APA citations and a reference list complete the grade. A paper that ends with next steps after a partial result reads as more credible than one claiming total success.

HCM 4040 Module 3 help from the desk

Many Module 3 papers name every tool in the textbook and use none of them. Pick three or four and show what each revealed. Another mistake is writing one large project and calling it a cycle; break the work into small tests that build on one another. Students also leave out the prediction, which makes the Study step impossible, because there is nothing to compare the results with. Watch for measures that cannot be collected, and give your aim a number and a date. If your workplace does not allow you to use its data, a composite setting with invented but realistic figures is acceptable when labeled as such. If you want the same structure applied to a delay or loss on your own unit, our writers can draft it for you.

Write yours, or have the desk draft it

This paper is an original model document written by our desk, not a submitted student paper and not an official Thomas Edison State University document. Read it for the moves, then write your own to the instructions in your classroom. If you want one built to your exact prompt and rubric, the first custom sample is free and arrives in 24 to 48 hours.

More HCM 4040 and B.S. in Healthcare Management sample papers

HCM 4040 Module 3 questions, answered

Where can I find a free HCM 4040 Module 3 sample paper?

The continuous improvement paper above is complete, with its cycle table, three test cycles, references and margin notes. Read it to see how tool choice and testing are written, then build your own on a problem you know.

How do I diagram the improvement cycle in a written paper?

A table listing each stage, the question asked, the tool used and what it showed works well. A labeled figure is also fine if your course site allows images in the submission.

Which improvement tools should I use?

Match each tool to a question: a flowchart to see a process, a Pareto chart to rank causes, a cause-and-effect diagram to explore one cause, and a run chart to watch results over time.

Do I need real data from my workplace?

No. Realistic composite figures are acceptable when you label the setting as a composite. Real data are fine too if your employer allows and nothing identifies patients.

What if my improvement project did not reach its aim?

Say so and explain what you learned. Reporting a partial result and the next test shows that you understand improvement as a continuing cycle.