| Course | ACC-1020 Principles of Managerial Accounting |
|---|---|
| Module | Module 2 |
| Paper type | Homework 2: management accounting and product costing |
| Length | About 827 words, 6 pages |
| Format | APA 7 student paper |
| School | Thomas Edison State University |
| Program | Bachelor of Science in Business Administration |
| Updated | October 2026 |
Free sample paper for ACC 1020 Module 2
Pinelands Drum Works, Inc.: Costing a Custom Touring Kit and a School Order With Job-Order Costing
Student Name
Bachelor of Science in Business Administration, Thomas Edison State University
ACC-1020: Principles of Managerial Accounting
Mentor Name
Month Day, Year
Pinelands Drum Works, Inc.: Costing a Custom Touring Kit and a School Order With Job-Order Costing
Pinelands Drum Works, Inc., the composite Burlington County drum maker introduced in Module 1, builds every order as a separate job: a custom kit for one drummer, a batch of practice snares for a retailer or a set of marching drums for a school. Because each job differs, it uses job-order costing, in which direct materials, direct labor and manufacturing overhead are accumulated on a job cost sheet for each order. This homework classifies the company's costs, sets the 2026 predetermined overhead rate, completes job cost sheets for two contrasting jobs, disposes of the year's over- or underapplied overhead and considers whether the overhead rate treats both jobs fairly.
Part A: Classifying Costs
Product costs ride along with the drums in inventory and reach the income statement only when a drum ships; period costs are charged as they happen. Among product costs, direct materials such as maple plies, hoops, lugs and heads, and direct labor such as the hours craftspeople spend building a specific drum, can be traced to a job. Manufacturing overhead covers production costs that cannot be traced economically: lacquer and sandpaper, the finishing booth's ventilation, depreciation on the shell press, factory supervision and the plant's utilities. The showroom manager's salary, advertising in drum magazines and office rent are period costs, recorded as selling or administrative expenses.
Part B: The Predetermined Overhead Rate
Overhead is incurred all year, but jobs must be costed as they are completed, so the company applies overhead with a rate set at the start of the year. Pinelands estimated 2026 manufacturing overhead of $420,000 and 21,000 direct labor hours, giving a rate of $20 per direct labor hour.
| Job cost sheet | Job 2614: custom 6-piece maple kit | Job 2615: 40 student snare drums |
|---|---|---|
| Direct materials | $1,840 | 40 x $62 = $2,480 |
| Direct labor | 38 hours x $26 = $988 | 60 hours x $24 = $1,440 |
| Overhead applied at $20 per labor hour | 38 x $20 = $760 | 60 x $20 = $1,200 |
| Total job cost | $3,588 | $5,120 ($128 per drum) |
| Selling price | $6,200 | 40 x $195 = $7,800 |
| Gross profit | $2,612 | $2,680 |
When Job 2614 is finished, its $3,588 cost moves from work in process to finished goods; when it is delivered, the cost moves to cost of goods sold and $6,200 of revenue is recorded. The same flow applies to the school order.
Part C: Over- or Underapplied Overhead
At the end of 2026, actual manufacturing overhead was $437,600, while actual direct labor hours were 21,400. Overhead applied to jobs was 21,400 hours times $20, or $428,000. Because applied overhead was $9,600 less than actual, overhead was underapplied, meaning the jobs completed during the year were costed too low. Because the shortfall is only about 2% of actual overhead, Pinelands simply adds it to the year's cost of goods sold, clearing the manufacturing overhead account to zero. Had the gap been large, it would have been spread across the three accounts holding that year's jobs: unfinished work, finished drums and drums already sold.
Part D: Does One Rate Fit Both Jobs?
The labor-hour rate assumes overhead is driven by how long people work on a job. At Pinelands that is only partly true. The largest overhead cost is the finishing booth, and a custom kit with a hand-rubbed lacquer finish spends many hours in the booth, with five to seven coats and long curing times, while student snares get a single wrapped finish and almost no booth time. The custom kit took 38 labor hours; the 40 student drums took 60. Under the current rate, the school order absorbs more overhead than the custom kit, even though it uses far less of the most expensive overhead resource.
Research supports the concern. Banker et al. (1995) studied manufacturing plants and found that overhead costs were driven not only by production volume but also by transactions such as setups and engineering changes, the kinds of activities that vary with product complexity rather than labor time. A second cost pool for the finishing booth, applied by booth hours, would shift overhead from simple jobs like the school order to complex jobs like the custom kit. That would likely show the custom kits are less profitable, and the school orders more profitable, than the current figures suggest, which matters because the company bids competitively on school contracts.
Cost assignment is also an ethical matter. The professional code for management accountants expects reports that are fair and objective and that leave out nothing a reader would need (Institute of Management Accountants, 2017). Shifting overhead to win a bid or to make a favored product line look better would breach those standards; adopting a better driver because it reflects how resources are actually used does not. Williams et al. (2023) present activity-based costing as one way to refine assignments like this when overhead is large and products differ widely.
References
Banker, R. D., Potter, G., & Schroeder, R. G. (1995). An empirical analysis of manufacturing overhead cost drivers. Journal of Accounting and Economics, 19(1), 115-137. https://doi.org/10.1016/0165-4101(94)00372-C
Institute of Management Accountants. (2017). IMA statement of ethical professional practice.
Williams, J. R., Bettner, M. S., & Smith, K. R. (2023). Financial & managerial accounting: The basis for business decisions (20th ed.). McGraw-Hill Education.
Reading the ACC 1020 Module 2 assignment instructions
Module 2 of ACC-1020 introduces management accounting and product costing. The homework template generally asks you to classify costs as product or period and as direct or indirect, compute a predetermined overhead rate, complete job cost sheets or a cost of goods manufactured schedule, and calculate and dispose of over- or underapplied overhead. Some templates add a short question on activity-based costing or on the differences between job-order and process costing. Work through each requirement in the template's order, show the formula for every rate, and label each cost element. Hand in the finished template before the deadline shown on the calendar for Module 2. Keep the template's job numbers and labels as given.
Inside the ACC 1020 Module 2 example
The homework introduces the company and why it uses job-order costing before computing anything. Part A classifies real cost items from a drum factory, which makes the categories concrete. Part B computes the overhead rate and presents two job cost sheets side by side, one custom and one high-volume, so the comparison in Part D has a basis. A short paragraph traces how a job's cost flows through the inventory accounts. Part C measures how far applied overhead fell short and explains where the shortfall goes. Part D questions the single rate using the company's own operations and research on cost drivers, then links costing choices to bidding and professional ethics. The arithmetic for each job is visible in the table.
Reading the ACC 1020 Module 2 grading rubric
Mentors grade product costing homework on correct classification, correct calculation of the predetermined rate, correct application of overhead using actual activity and the predetermined rate, accurate job totals and correct handling of over- or underapplied overhead. A frequent source of lost points is applying actual overhead to jobs instead of the predetermined rate. Where the template asks for discussion, such as whether a cost driver is appropriate, mentors look for reasoning tied to the business rather than a textbook definition. Clear labels and the template's layout complete the grade, and consistent figures across the parts show that the work hangs together. Credit for discussion answers depends on linking the driver to how the factory works.
Common ACC 1020 Module 2 mistakes, and how to avoid them
Common Module 2 mistakes include treating factory supervision or plant depreciation as period costs, computing the overhead rate with actual rather than estimated figures, and calling an amount overapplied when applied overhead was less than actual. Remember: applied below actual means underapplied, and cost of goods sold must go up. Students also apply overhead using machine hours when the rate is based on labor hours. If a template asks about activity-based costing, explain which costs are driven by activities other than volume. Our tutors can complete the ACC 1020 Module 2 template with the costs and jobs in your assignment, explaining each step. Recheck which base your overhead rate uses before applying it.
Write yours, or have the desk draft it
This paper is an original model document written by our desk, not a submitted student paper and not an official Thomas Edison State University document. Read it for the moves, then write your own to the instructions in your classroom. If you want one built to your exact prompt and rubric, the first custom sample is free and arrives in 24 to 48 hours.
More ACC 1020 and Bachelor of Science in Business Administration sample papers
- ACC 1020 Module 1: Financial Analysis Homework
- ACC 1020 Module 3: CVP Analysis Homework
- ACC 1020 Module 4: Decisions and Responsibility Homework
- ACC 1020 Module 5: Budgets and Variances Homework
- ACC 1020 Module 6: Capital Budgeting Homework
- MKT 2010 Module 2: Buyers and Markets Assignment
- MAN 2100 Module 8: Final Project
- ACC 4210 Module 2: Gross Income Written Assignment
- ETH 2200 Module 1: Final Project Part 1: Reflection on Leadership
ACC 1020 Module 2 questions, answered
Where can I find a free ACC 1020 Module 2 sample paper?
Read the complete Module 2 homework above: cost classification, a predetermined overhead rate, two job cost sheets, the treatment of underapplied overhead and a discussion of cost drivers, all with margin notes.
How is a predetermined overhead rate calculated?
Before the year starts, take the overhead the plant expects to spend and spread it over the driver it expects to use, for instance machine or labor hours.
What does underapplied overhead mean?
Overhead applied to jobs was less than the overhead actually incurred, so jobs were costed too low. A small amount is usually added to cost of goods sold.
What is the difference between product and period costs?
Product costs attach to inventory and are expensed as cost of goods sold when goods are sold. Selling and office costs, by contrast, hit the income statement in the month they occur.
When is activity-based costing worth using?
When overhead is large and products use overhead resources very differently, so a single volume-based rate would distort product costs.