DBA 8000 Module 4 Final Project: A Lean Six Sigma Decision Study of Stat Turnaround Time Example

Reviewed by Edgar Pennington, MBA Thomas Edison State University Updated October 2026

This DBA 8000 Module 4 sample is the final project in Critical Thought and Informed Action, the closing assignment for TESU's Doctor of Business Administration, presented with the module on tools and techniques for effective decision making. DBA-8000 asks the final project to demonstrate the knowledge and skills gained in the course. The study applies Lean Six Sigma's DMAIC method to a decision the composite laboratory network faces: how to raise the share of emergency department potassium results reported within 60 minutes from 74 to 90 percent. It defines and measures the problem, analyzes causes with Pareto and fishbone tools, chooses solutions with a weighted decision matrix and sets a control plan, then shows how the findings shape the core lab decision.

CourseDBA-8000 Critical Thought and Informed Action Models of Decision Making and Organization Achievement
ModuleModule 4
Paper typeFinal project: applying decision tools and techniques to an organizational problem
LengthAbout 1,075 words, 6 pages
FormatAPA 7 student paper
SchoolThomas Edison State University
ProgramDoctor of Business Administration
UpdatedOctober 2026

Free sample paper for DBA 8000 Module 4

1

From 74 to 90 Percent in an Hour: A DMAIC Decision Study of Emergency Laboratory Turnaround

Student Name

Doctor of Business Administration, Thomas Edison State University

DBA-8000: Critical Thought and Informed Action: Models of Decision Making and Organization Achievement

Mentor Name

Month Day, Year

What this page is doingThe title gives the project's baseline and target, the measurable improvement the study is built around.
2

From 74 to 90 Percent in an Hour: A DMAIC Decision Study of Emergency Laboratory Turnaround

Why This Decision

Emergency physicians need potassium results quickly; a delayed result can delay treatment for patients with heart rhythm problems or kidney failure. The network's goal is for nine in ten emergency potassium results to reach clinicians within an hour of the order. Last quarter we achieved 74 percent. The question is not only how to improve, but which of several possible fixes to fund, and whether the answer affects the core laboratory decision analyzed in Modules 1 to 3.

Define

George et al. (2005) describe DMAIC, define, measure, analyze, improve and control, as Six Sigma's structured method for improving existing processes, with tools matched to each phase.

ElementDefinition
ProblemOnly 74 percent of emergency potassium results reported within 60 minutes
Goal90 percent within 60 minutes within six months
ScopeOrder to result in the two largest hospital emergency departments
CustomersEmergency physicians and nurses, and their patients
TeamLaboratory manager, emergency nurse educator, phlebotomy lead, IT analyst, Six Sigma black belt

Measure

We extracted timestamps for 1,200 emergency potassium orders over six weeks: order, collection, receipt in the laboratory, start of testing and result verification. The median order-to-result time was 48 minutes, but the 90th percentile was 82 minutes: most results were fast, and a long tail of delays caused the misses. We confirmed the data's accuracy by observing 60 specimens directly and comparing the observed times with the system's timestamps; 57 matched within two minutes.

Analyze

A Pareto analysis of the 312 results reported after 60 minutes, sorted by the stage where most of the delay occurred, showed that a few causes dominated.

Transport and hemolysis together account for nearly two thirds of late results. A fishbone diagram built by the team traced each to root causes. Transport delays came from methods, specimens sent in batches when the tube station was busy, and machines, a pneumatic tube system without priority routing. Hemolysis came from methods and people: specimens drawn through intravenous catheters, and new nurses untrained in collection technique. The five whys applied to hemolysis led to an onboarding program that covers the electronic record but not specimen collection.

Cause of delayShare of late resultsCumulative
Specimen transport from emergency department to laboratory41 percent41 percent
Hemolyzed specimen requiring recollection23 percent64 percent
Wait for centrifuge17 percent81 percent
Wait for result verification11 percent92 percent
Other8 percent100 percent
What this page is doingUsing the Pareto chart to show that two causes explain most late results focuses the decision on where money will do the most good.
3

Improve: Choosing Among Solutions

The team generated seven possible solutions. Rather than adopt all of them, we compared them with a weighted decision matrix, applying the decision discipline of Module 1. Scores are 1 to 5.

We chose the top four: collection training, priority tube routing, a dedicated centrifuge and autoverification. Point-of-care testing scored low because of cost and the quality control burden it would place on emergency staff. Ranking the options this way follows the decision matrix logic Peterson (2017) sets out, with outcomes judged across the states that might occur.

SolutionImpact on late results (0.40)Cost (0.25)Speed to implement (0.20)Staff acceptance (0.15)Weighted score
Priority routing for stat specimens in the pneumatic tube system53454.30
Collection training and a hemolysis checklist for emergency nurses45544.45
Dedicated stat centrifuge34553.95
Autoverification rules for normal potassium results34343.40
Point-of-care potassium testing in the emergency department41232.70
Additional night technologist21352.40
Courier runs every 15 minutes32432.95

Guarding Against Bias in the Choice

The bias safeguards from Module 2 applied here. To avoid anchoring on the tube vendor's promised transit time, we timed test runs ourselves: priority routing cut median transit from 9 to 4 minutes, close to but not quite the vendor's 3. To counter confirmation, the emergency nurse educator, who initially doubted the hemolysis data, was asked to review the specimens herself; she found the catheter-draw pattern independently, which strengthened her support for the training.

Results of a Pilot

We piloted the four solutions in one emergency department for eight weeks. The share of potassium results within 60 minutes rose from 73 to 89 percent, the hemolysis rate fell from 7.8 to 3.9 percent, and the 90th percentile fell from 84 to 61 minutes.

Control

Linderman et al. (2003) argued that Six Sigma works partly through goal setting: specific, challenging goals combined with structured methods. The control plan keeps the goal visible.

Control elementPlan
MeasureWeekly share of emergency potassium results within 60 minutes, by hospital
Control chartp-chart of the weekly share, reviewed by the laboratory manager
Response planIf two consecutive weeks fall below 85 percent, the team reconvenes
HemolysisMonthly hemolysis rate by nursing unit, shared with nurse managers
OwnershipLaboratory manager owns the process; quarterly report to the quality committee

Culture and Complexity

In Cynefin terms, turnaround is a complicated problem: cause and effect can be found through analysis, which is why DMAIC worked. The culture of site autonomy helped here: each emergency department and laboratory owned its improvements, and the pilot site's success persuaded the second. De Koning et al. (2006) reported that Lean Six Sigma in hospitals succeeds when it is led by staff who own the processes and supported by data, a pattern our project followed.

What the Study Means for the Core Lab

The study changes the core lab decision. Stat potassium and other emergency tests must be reported within an hour; specimens cannot travel to a central laboratory miles away. Any core lab must therefore leave a rapid-response laboratory at each hospital for stat work. That lowers the core lab's savings, since each hospital keeps some staff and analyzers, and it strengthens the case, already favored in Modules 2 and 3, for a phased consolidation of routine, non-urgent testing only. Decision theory framed the investment; DMAIC revealed an operational constraint the matrix had not captured.

Conclusion

DMAIC turned a vague complaint about slow results into a defined problem, measured causes and chosen solutions that raised timely results from 74 to 89 percent in a pilot. The project also showed how the course's tools fit together: decision matrices to choose among solutions, bias safeguards to protect the choice, attention to culture and complexity to make the change stick, and an operational study that improved a strategic decision.

References

de Koning, H., Verver, J. P. S., van den Heuvel, J., Bisgaard, S., & Does, R. J. M. M. (2006). Lean Six Sigma in healthcare. Journal for Healthcare Quality, 28(2), 4-11. https://doi.org/10.1111/j.1945-1474.2006.tb00596.x

George, M. L., Rowlands, D., Price, M., & Maxey, J. (2005). The Lean Six Sigma pocket toolbook. McGraw-Hill.

Linderman, K., Schroeder, R. G., Zaheer, S., & Choo, A. S. (2003). Six Sigma: A goal-theoretic perspective. Journal of Operations Management, 21(2), 193-203. https://doi.org/10.1016/S0272-6963(02)00087-6

Peterson, M. (2017). An introduction to decision theory (2nd ed.). Cambridge University Press.

DBA 8000 Module 4 instructions, in plain terms

The DBA-8000 final project, worth 25 percent of the grade, demonstrates the knowledge and skills gained in the course, with requirements in the course's Final Project section. Module 4 also includes a reflection paper on what you learned. Expect to apply decision tools and techniques, such as DMAIC and root cause analysis from The Lean Six Sigma Pocket Toolbook, to an organizational problem with real data, and to integrate the course's earlier themes: decision theory, bias and culture and complexity. Show each tool's output and the decision it informed. Validate your data before analyzing it, show each tool's output, and explain how your findings change a larger decision in your organization. Keep each phase of the method visible in its own section.

How this DBA 8000 Module 4 example is built

The study defines the problem and goal in a table, measures turnaround with validated data and analyzes causes with a Pareto table, a fishbone and the five whys. A weighted decision matrix chooses four of seven solutions, and a section applies bias safeguards. Pilot results, a control plan and a section on culture and complexity follow. A section explains how the findings change the core lab decision, and the conclusion ties the course's tools together. Sections apply bias safeguards to the choice of solutions, report pilot results with figures and use the Cynefin framework to explain why the method worked for this problem. A weighted decision matrix explains why four of seven solutions were chosen.

Reading the DBA 8000 Module 4 grading rubric

Mentors grade the final project on correct use of decision tools and techniques, analysis based on real data, integration of the course's themes and scholarly writing. Projects that show each DMAIC phase with its tool and output demonstrate command of the method. Choosing solutions with a weighted matrix and bias safeguards shows integration with earlier modules. Linking an operational study to a strategic decision demonstrates the doctoral-level synthesis the course aims for. Reporting pilot results against the baseline, and a control plan with a response rule, shows the project can sustain its gains. Validating timestamps against direct observation shows care with data.

Common DBA 8000 Module 4 mistakes, and how to avoid them

Students lose points by naming tools without showing their output, by proposing solutions without data on causes or by treating the project as separate from the course's earlier themes. Others skip the control phase. Validate your data. Show the Pareto and root cause analysis. Choose solutions with a transparent method. Set a control plan. Link the findings to a larger decision. Report results against your baseline, and set a control plan with a clear response if performance slips. Show the output of every tool you name, from the Pareto table to the control chart. A free first sample on your own DBA-8000 final project is available on request. Report the potassium turnaround before and after in the same units, so the gain from DMAIC is visible.

Write yours, or have the desk draft it

This paper is an original model document written by our desk, not a submitted student paper and not an official Thomas Edison State University document. Read it for the moves, then write your own to the instructions in your classroom. If you want one built to your exact prompt and rubric, the first custom sample is free and arrives in 24 to 48 hours.

More DBA 8000 and Doctor of Business Administration sample papers

DBA 8000 Module 4 questions, answered

Where can I find a free DBA 8000 Module 4 sample paper?

A DMAIC decision study of emergency laboratory turnaround time is the final project above.

What is DMAIC?

The five-phase Six Sigma cycle, define, measure, analyze, improve and control, used to fix a process that already exists.

What does a Pareto analysis show?

A bar chart of causes ranked by frequency; for the lab it showed that transport and hemolysis explained most late potassium results.

Why use a weighted decision matrix to choose solutions?

It compares options on stated criteria and weights, making the choice transparent and less prone to bias.

How much is the DBA-8000 final project worth?

Twenty-five percent of the course grade.